SOURCE: RAUNAK KUNDE / NEWS BEAT / IDRW.ORG
BrahMos Aerospace Thiruvananthapuram Limited has secured a significant contract to supply Afterburner Liner Assembly, along with essential tooling and fixtures, for the Gas Turbine Research Establishment (GTRE)’s 80KN engine program under the aegis of the Defence Research and Development Organisation (DRDO).
This development underscores the growing collaboration between DRDO and the Indian industry in the critical domain of aerospace propulsion. The 80KN engine program is a pivotal component of DRDO’s efforts to develop a new afterburner module for the Dry Kaveri engine. Once successfully integrated, this engine is slated to power an LCA-Tejas Trainer aircraft, marking a crucial step in the engine’s certification process.
BrahMos Aerospace’s expertise in advanced manufacturing and precision engineering will be instrumental in delivering the high-quality Afterburner Liner Assembly required for this critical project.
NOTE : Article cannot be reproduced without written permission of idrw.org in any form even for YouTube Videos to avoid Copy right strikes. Websites doing illegal reproductions will get DMCA and Legal Notices.